Production & facilities
Locations
Three hubs. Covering Dubai north to south
Take a tour of the facilities
OverviewExplore the stages of concrete production, from material storage to dispatch. DMIX operates eight batching plants across three Dubai depots, supported by dedicated cooling, laboratory testing and a delivery fleet.
Batching, cooling, storage and testing




Computer-controlled batching
680 m³ an hour from eight batching plants
All eight plants batch concrete to the approved mix, from three operating depots.
Fleet
Delivery and placement
95+
Transit mixers
Each with a capacity of 12 m³, on Mercedes, Volvo and Scania chassis.
Fleet-wide
GPS tracking
Dispatch coordinates deliveries from all three depots, with records kept for traceability.
72+
Pumps & placing booms
14 mobile pumps, 22 static pumps, 36 placing booms and six distributors.
Process
From raw material to the pour
Nine controlled steps, in line with approved project specifications.
Step 1: Raw materials
Cement, aggregates, water and admixtures are selected and tested against applicable standards and the project specification.
Step 2: Mix design & approval
Project-specific mix designs are developed through laboratory and plant trials and approved before production.
Step 3: Batching & mixing
Computerised batching plants weigh and proportion each material automatically for consistent concrete.
Step 4: Temperature management
Concrete temperature is monitored and controlled to meet the project’s limits and placement requirements.
Step 5: Quality control & testing
Routine fresh-concrete tests, with samples prepared for compressive strength and durability testing.
Step 6: Delivery & traceability
Coordinated dispatch sends fresh concrete by transit mixer, with delivery records kept for traceability.
Step 7: Pumping & distribution
Mobile pumps, static pumps, Molly pumps, mechanical distributors and placing booms suit each site.
Step 8: Controlled placement
Concrete is placed to approved method statements, the project specification and site requirements.
Step 9: On-site monitoring
Technical and quality teams monitor workability, temperature and other parameters during delivery and placement.